Jump to content

Interstate 57

Route map:
From Wikipedia, the free encyclopedia

Interstate 57 marker
Interstate 57
Map
I-57 highlighted in red
Route information
Maintained by ArDOT, MoDOT and IDOT
Length508.92 mi (819.03 km)
Existed1959–present
NHSEntire route
Arkansas segment
Length122.80 mi (197.63 km)
South end I-40 / US 67 / US 167 in North Little Rock, AR
Major intersections
North end US 67 / US 412 / US 412B in Walnut Ridge, AR
Original segment
Length386.12 mi[1] (621.40 km)
South end I-55 / US 60 in Sikeston, MO
Major intersections
North end I-94 in Chicago, IL
Location
CountryUnited States
StatesArkansas, Missouri, Illinois
CountiesAR: Pulaski, Lonoke, White, Jackson, Craighead, Lawrence

MO: Scott, Mississippi

IL: Alexander, Pulaski, Union, Johnson, Williamson, Franklin, Jefferson, Marion, Fayette, Clay, Effingham, Shelby, Cumberland, Coles, Douglas, Champaign, Ford, Iroquois, Kankakee, Will, Cook
Highway system
AR 56AR AR 57
US 56MO Route 58
IL 56IL IL 57

Interstate 57 (I-57) is a north–south Interstate Highway that currently exists in two segments. It runs through Arkansas, Missouri, and Illinois. I-57 parallels the old Illinois Central Railroad for much of its route north of I-55. The Interstate begins at I-40 in North Little Rock, Arkansas, traveling northward concurrently with U.S. Highway 67 (US 67) until it reaches Walnut Ridge, Arkansas, where the Interstate ends for now. I-57 will run northward to meet up with the existing segment in southeastern Missouri. I-57 resumes its run from Sikeston, Missouri, at I-55 to Chicago, Illinois, at I-94. I-57 essentially serves as a shortcut route for travelers headed between the Southern United States (Memphis, New Orleans, etc.) and Chicago, bypassing St. Louis, Missouri, and Springfield, Illinois. Between the junction of I-55 and I-57 in Sikeston and the junction of I-55 and I-90/I-94 in Chicago, I-55 travels for 436 miles (702 km), while the combination of I-57 and I-94 is only 396 miles (637 km) long between the same two points. In fact, both the control cities on the overhead signs and the destination mileage signs reference Memphis along southbound I-57, even as far north as its northern origin at I-94 in Chicago.[2] Likewise, at its southern end in Missouri, Chicago is the control city listed for I-57 on signs on northbound I-55 south of Sikeston, even though I-55 also goes to Chicago.[3]

A southward extension of I-57 from Sikeston to Little Rock, Arkansas, is currently in various stages of development. On November 7, 2024, 122.80 miles (197.63 km) of US 67 from North Little Rock to Walnut Ridge in Arkansas was officially redesignated to I-57, finally extending the Interstate to the state of Arkansas.[4]

Route description

[edit]
Lengths
  mi[1] km
AR 122.80 197.63
MO 21.96 35.34
IL 364.16 586.06
Total 508.92 819.03

Arkansas

[edit]

In Arkansas, I-57 begins in North Little Rock at I-40, running concurrently with US 67 and US 167. I-440 westbound begins at the junction of the two Interstates in Jacksonville. I-57 continues northbound through Jacksonville, and the Interstate temporarily narrows from six lanes to four lanes at the Main Street interchange. I-57 is four lanes until it widens back to six lanes just north of the Vandenberg Boulevard interchange (exit 11). I-57 widens back to six lanes for five miles (8.0 km) northbound until an interchange with Highway 5 (AR 5) and AR 89 in Cabot. At this point, the Interstate reverts to four lanes as it continues north through Cabot.[a] After the AR 5/AR 89 interchange in Cabot, I-57 reverts to four lanes until it ends in Walnut Ridge. In Beebe, US 64 runs concurrently with the Interstate and continues east for 27 miles (43 km) until exit 55 in Bald Knob where US 64 splits off to the east and US 167 splits off to the north to Batesville. I-57 continues northbound from Bald Knob, through Newport to Walnut Ridge, where it runs concurrently with US 412. The Interstate ends at unsigned exit 124 in Walnut Ridge, where US 67 continues north to Pocahontas and US 412 splits off to the east.

Missouri

[edit]
The Cairo I-57 Bridge between Missouri and Illinois

In Missouri, I-57 begins in Sikeston at a cloverleaf interchange with I-55 as a continuation of US 60 and heads east. Entering Charleston, the Interstate almost immediately interchanges with I-57 Bus./Route 105. Southeast of the city, it then turns to the northeast. To the east of Charleston, the US 60 concurrency ends after about 12 miles (19 km) when I-57 meets US 62/Route 77, with US 60 heading eastward and I-57 Bus. ending. I-57 eventually meets the Missouri–Illinois state line at the Mississippi River, crossing the Cairo I-57 Bridge into Cairo, Illinois.

Illinois

[edit]
The Dan Ryan Expressway West Leg (now more commonly referred to as I-57) at 99th Street in 1970

I-57 is the longest Interstate Highway in the state of Illinois, spanning 364.16 miles (586.06 km) long with Chicago being the main city along its northern route and Memphis being the southern main city along its southern route. I-57 then enters Illinois across the Mississippi River into Cairo. It passes through Mounds and Ullin, and then it makes an interchange with US 51, making US 51 depart from its temporary concurrency with the Interstate. I-57 then continues north and has an interchange with I-24 toward Nashville, Tennessee. It then continues to head toward Marion, West Frankfort, Benton, Whittington, and Ina and then heads into Mount Vernon. In Mount Vernon, I-57 has a short concurrency with I-64 while making two diamond interchanges with the city's streets. I-64 then leaves I-57 and continues its western route toward St. Louis, Missouri, while I-57 continues toward Effingham. In Effingham, I-70 joins I-57 and makes interchanges with the city's streets once again. I-70 then departs from I-57 and continues east toward Terre Haute and Indianapolis, Indiana. As for I-57, it continues and heads toward Mattoon where it has a cloverleaf interchange with US 45 and then heads toward Champaign where it meets the terminus of I-72 in a cloverleaf interchange. It then travels for another two miles (3.2 km) and then meets up with a soon to be changed from a cloverleaf interchange to a semi-directional interchange with I-74 going east toward Indianapolis (again) and west toward Bloomington. The Interstate then heads toward Kankakee and then into Cook County where it meets its own terminus with I-94 ending in Chicago.

History

[edit]

The oldest segment of I-57 is a 6.2-mile (10.0 km) strip running east of Bradley to Kankakee labeled on the 1959 Illinois state highway map.[5] Two years later, a 33-mile (53 km) stretch of I-57 from Dongola north to Marion opened on September 26, 1961.[6] Another portion between the Illinois Route 121 (IL 121)/US 45 exit and the Watson–Mason exit was completed and opened prior to July 1965, linking I-57 to I-70 and running in tandem with I-70 for several miles, with access to Indianapolis, Indiana, to the east and St. Louis, Missouri, to the west.[citation needed] A 21.5-mile (34.6 km) section of I-57 in Jefferson County from Bonnie (using a temporary road that is still partially visible from the northbound lanes) to IL 161 later opened on December 9, 1969.[7] The portion of I-57 in Chicago (known as the Dan Ryan West Leg Extension) was constructed and opened in segments between 1963 and 1970.[8] It remains the most recent Interstate Highway to be established within the city. The final section of I-57 in Illinois opened in December 1971 at Paxton.[9]

The portion of I-43 from Milwaukee to Green Bay was originally numbered as I-57.[10] The number was changed due to the existence of I-57 in Illinois.[11]

I-57 was widened to six lanes in Effingham from 2011 until 2016.[12]

For many years, an interchange at the junction of I-57 with I-294 did not exist. It was one of the few places in the U.S. where Interstates cross but have no interchange. The Illinois Department of Transportation (IDOT) and Illinois State Toll Highway Authority (ISTHA) opened Phase 1 of a new interchange in 2014, providing access from I-57 north to I-294 north and from I-294 south to I-57 south.[13] Phase 2, which completed the remaining movements except for northbound I-57 to southbound I-294 and northbound I-294 to southbound I-57, was opened to traffic on September 11, 2022.[14]

Future

[edit]
Sign for then Future I-57 in North Little Rock, Arkansas on March 1, 2018

I-57 is slated to eventually be extended west along US 60 to Poplar Bluff, Missouri, and then south along the US 67 corridor to North Little Rock, Arkansas, ending at I-40.[15] The extension is listed under High Priority Corridor 89, the I-57 Corridor Extension.[16] In April 2016, a provision designating US 67 from North Little Rock to Walnut Ridge, Arkansas, as "Future I-57" was added into the federal fiscal year 2017 Transportation, Housing and Urban Development funding bill and officially became law in 2017.[17] On November 7, 2024, the section of US 67 between North Little Rock and Walnut Ridge, Arkansas, was officially designated as I-57 by ArDOT.[18]

Missouri has already converted 62 miles (100 km) of the US 60/US 67 corridor between Sikeston and US 160/Route 158 near Harviell to a mixture of freeway and expressway segments. All at-grade crossings along the corridor would have to be eliminated before the Interstate designation could be applied.[19] This leaves about twelve miles (19 km) of new freeway between US 160/Route 158 to the Arkansas state line to be constructed.[20]

In Arkansas, 118 miles (190 km) of Interstate-grade US 67 runs from I-40 to US 412 in Walnut Ridge, leaving a segment of approximately 40 miles (64 km) of new Interstate-grade highway along US 67 that still would need to be built in northeastern Arkansas.[21] The Arkansas Department of Transportation (ArDOT) announced in September 2023 that work to extend Future I-57 in Clay County would begin in late 2024 or early 2025 depending on when contracts are let along with completion of the final design process.[22] The first section will be between the US 67 interchanges at Walnut Ridge and Corning while the second section (which will begin construction starting in 2025) will extend the first section northward to the Missouri state line.[23] Plans for the Corning Bypass show Arkansas Highway 657 (AR 657) as a temporary designation for this section until other sections are completed.[24] ARDOT announced on November 6, 2024, that ground would be broken on the Corning Bypass on November 14, 2024.[25]

Exit list

[edit]
StateCountyLocationmi[26][27]kmExitDestinationsNotes
ArkansasPulaskiNorth Little Rock0.00.0


I-40 west / US 67 south / US 167 south – Little Rock, Fort Smith
Southern end of US 67/US 167 concurrency; southern terminus
155
I-40 east – Memphis
Southbound exit and northbound entrance; exit number corresponds to I-40; exit 155 on I-40
0.9–
1.2
1.4–
1.9
1McCain BoulevardSigned as exits 1A (east) and 1B (west) northbound
Sherwood1.93.12Trammel RoadNorthbound exit only
3.25.13Wildwood Avenue / Trammel RoadNo northbound access to Trammel Road
3.96.34
AR 176Y north to Brockington Road
Northbound exit and southbound entrance; southern terminus of AR 176Y
4.36.95
AR 176 west (Kiehl Avenue)
Eastern terminus of AR 176
Jacksonville6.09.76
I-440 west – Memphis, Texarkana
Current eastern terminus and exit 13 on I-440
8.313.48Redmond RoadNorthbound exit and southbound entrance
8.513.79Main Street
9.214.810AJames Street
10.116.310B
AR 161 south / Gregory Street
AR 161 not signed southbound; northern terminus of AR 161
10.617.111A
AR 161 south / Vandenberg Boulevard
Signed as exit 11 southbound; AR 161 not signed northbound; northern terminus of AR 161
11.318.211BAir Force BaseNorthbound exit and entrance; accsss via T.P. White Drive
Lonoke15.7–
16.0
25.3–
25.7
16


AR 5 north / AR 321 north / AR 367 north – Heber Springs, Cabot
Signed as exits 16A (AR 321) and exit 16B (AR 5) northbound
Cabot18.429.619 AR 89 – Cabot
20.432.821
AR 38 east – Cabot
Western terminus of AR 38
Austin21.634.822 AR 305 – Austin
Ward24.238.925 AR 319 – Ward
WhiteBeebe27.844.728

US 64 west / US 67B north – Beebe, Conway
Southern end of US 64 concurrency; southern terminus of US 67B
28.846.329
AR 367S south – Beebe
Northern terminus of AR 367S
30.148.431
US 67B south / AR 31 – Beebe, Antioch
Northern terminus of US 67B
34.655.735 AR 13 – McRae, GarnerFormer AR 371
Searcy41.666.942

US 67B north / AR 367 south – Searcy, Garner
Southern terminus of US 67B; northern terminus of AR 367
43.269.544 AR 367 – Searcy
44.671.845
AR 36 west / AR 367 – Searcy
AR 367 not signed; eastern terminus of AR 36
45.873.746

US 67B south / AR 36 east – Searcy, Kensett
Northern terminus of US 67B; western terminus of AR 36
47.476.348 AR 385 – Judsonia
50.581.351 AR 157 – Judsonia
54.086.954Bald Knob Lake Road
Bald Knob54.988.455

US 64 east / US 167 north – Bald Knob, Batesville
Northern end of US 64/US 167 concurrency
59.595.860RussellAccess via SE 3rd Street
64.9104.465 AR 87 – Bradford
Jackson68.6110.469 CR 315 – Possum Grape
Bridge over White River
Ingleside73.5118.374
AR 224 east
Western terminus of AR 224
80.0128.780
AR 14 / AR 224 west – Waldenburg
AR 224 not signed
82.3132.482 AR 17 – Newport
Newport83.4134.283 AR 384 – Newport
85.5137.685 AR 18 – Newport, Grubbs
87.8141.387 CR 43
96.3155.095 AR 37 – Tuckerman, Grubbs
Craighead102.7165.3102
US 78 east / AR 226 – Jonesboro, Cash, Arkansas State University
Western terminus of US 78; former routing of US 67
LawrenceAlicia110.1177.2111

AR 230 to AR 91 / AR 367 – Alicia, Bono
Walnut Ridge120.0193.1121
US 63 / US 412 west – Hoxie, Jonesboro
Southern end of US 412 concurrency; signed as exits 121A (north) and 121B (south) southbound; former routing of US 67
122.8197.6124


US 67 north / US 412 east / US 412B west – Paragould, Walnut Ridge
Northern end of US 67/US 412 concurrency; current northern terminus; eastern terminus of US 412B; exit number not signed
Gap in designation, connection made via US 67 and US 60
MissouriScottSikeston0.0000.000
US 60 west – Dexter, Poplar Bluff
Southern end of US 60 concurrency; continuation west
1 I-55 – Memphis, St. LouisSigned as exits 1A (south) and 1B (north); exit 66A on I-55
MississippiLong Prairie Township4.9167.9124 Route B – Bertrand
Charleston10.74517.29210
I-57 BL north / Route 105 – Charleston, East Prairie
Southern terminus of I-57 BL
13.02720.96512

I-57 BL south / US 60 east / US 62 / Route 77 – Charleston, Wyatt
Northern end of US 60 concurrency; northern terminus of I-57 BL
Mississippi River22.328
0.00
35.933
0.00
Interstate 57 Bridge
Missouri–Illinois state line
IllinoisAlexanderCairo1.42.31
US 51 south / IL 3 – Cairo, Olive Branch
Southern end of US 51 concurrency
PulaskiMounds7.612.28Mounds Road
Ullin17.728.518UllinAccess via CR 7
UnionDongola24.439.324Dongola Road
25.040.225
US 51 north – Carbondale
Northern end of US 51 concurrency; northbound exit and southbound entrance
Anna30.048.330 IL 146 – Anna, Vienna
Buncombe36.358.436Lick Creek Road
JohnsonGoreville39.763.940Goreville Road
WilliamsonSouthern Precinct43.970.744
I-24 east – Nashville
Western terminus of I-24
45.272.745 IL 148 (Refuge Road)
Marion52.985.153Main Street – MarionFormer IL 13
53.686.354 IL 13 / The Hill Avenue – Carbondale, HarrisburgSigned as exits 54A (IL 13) and 54B (The Hill Avenue) northbound
Johnston City58.994.859Johnston City, HerrinAccess via CR 1
FranklinWest Frankfort64.6104.065 IL 149 – West Frankfort, Zeigler
West City71.6115.271 IL 14 – Benton, ChristopherTo IL 34
Ewing Township77.5124.777 IL 154 – Sesser, Whittington
JeffersonIna82.6132.983InaAccess via North Avenue
Dodds Township91.5147.392
I-64 east – Louisville
Southern end of I-64 concurrency; exit 78 on I-64
Mt. Vernon93.7150.894Veterans Memorial Drive
94.7152.495 IL 15 – Mt. Vernon, Ashley
96.2154.896
I-64 west – St. Louis
Northern end of I-64 concurrency; exit 73 on I-64
Dix103.5166.6103DixAccess via CR 39
MarionRaccoon Township109.2175.7109 IL 161 – Centralia
Salem116.4187.3116 US 50 – Salem, Sandoval
Kinmundy Township127.2204.7127Patoka, KinmundyAccess via CR 8
FayetteFarina135.4217.9135 IL 185 – Farina, Vandalia
Clay
No major junctions
EffinghamMason Township144.7232.9145EdgewoodAccess via CR 29
150.7242.5151Watson, MasonAccess via IL 37
Summit Township157.3253.1157
I-70 west – St. Louis
Southern end of I-70 concurrency; exit 92 on I-70
Effingham159.4256.5159Fayette Avenue
160.5258.3160 IL 32 / IL 33Access to Lake Shelbyville and Convention Center
162.2261.0162 US 45 – Sigel, EffinghamAccess to Lake Land College and Kuthe Center
Teutopolis Township163.4263.0163
I-70 east – Indianapolis
Northern end of I-70 concurrency; exit 98 on I-70
Shelby
No major junctions
CumberlandNeoga Township177.0284.9177 US 45 – Neoga
ColesMattoon184.4296.8184 US 45 / IL 121 – Mattoon, Toledo
189.6305.1190 IL 16 – Charleston, MattoonSigned as exits 190A (east) and 190B (west); access to Coles County Airport and Eastern Illinois University
192.4309.6192 CR 18 (Mattoon-Charleston Enterprise Parkway)
DouglasArcola203.6327.7203 IL 133 – Paris, Arcola
Tuscola211.7340.7212 US 36 – Newman, Tuscola
ChampaignPesotum219.9353.9220 US 45 – Tolono, Pesotum
Tolono Township228.6367.9229Monticello, Savoy, TolonoAccess via CR 18; access to Willard Airport
Champaign Township231.7372.9232Curtis Road
Champaign235.2378.5235 I-72 to University Avenue – Springfield, DecaturSigned as exits 235A (east) and 235B (west); I-72 east not signed; exits 182A-B on I-72
237.4382.1237 I-74 – Indianapolis, PeoriaSigned as exits 237A (east) and 237B (west); exits 179A-B on I-74
238.4383.7238Olympian Drive
Hensley Township240.5387.0240Market Street
Rantoul250.2402.7250 US 136 – Rantoul, Fisher
FordPaxton260.9419.9261 IL 9 – Paxton, Gibson City
IroquoisArtesia Township271.9437.6272Buckley, RobertsAccess via CR 9; Roberts not signed southbound
Onarga Township279.9450.5280 IL 54 – Onarga, RobertsRoberts not signed northbound
Gilman282.9455.3283 US 24 – Gilman, Chatsworth
Ashkum Township292.7471.1293 IL 116 – Ashkum, Pontiac
Clifton296.5477.2297CliftonAccess via CR 4
Chebanse Township301.6485.4302ChebanseAccess via CR 37
KankakeeKankakee307.5494.9308 US 45 / US 52 – Kankakee
311.6501.5312 IL 17 – Kankakee, Momence
315.3507.4315 IL 50 – Bradley, Bourbonnais
Bourbonnais318.4512.4318Bourbonnais ParkwayOpened November 2, 2018[28]
Manteno321.6517.6322MantenoAccess via CR 9
WillPeotone Township327.1526.4327Wilmington, PeotoneAccess via CR 25
Monee335.1539.3335Manhattan, MoneeAccess via CR 6
University Park337.1542.5337Stuenkel Road / University ParkwayAccess to Governors State University; interchange opened on October 30, 2015[citation needed]
CookRichton Park339.0545.6339Sauk Trail
Matteson340.69548.29340 US 30 / Lincoln Highway – MattesonSigned as exits 340A (east) and 340B (west) southbound
342.21550.73342Vollmer RoadSigned as exits 342A (east) and 342B (west) southbound
Bremen Township344.67–
344.86
554.69–
555.00
345
I-80 to I-294 – Indiana, Iowa
Signed as exits 345A (east) and 345B (west); exits 151A-B on I-80
346.62557.83346
167th Street to IL 50 (Cicero Avenue)
Signed as exits 346A (east) and 346B (west)
Markham347.90559.89348 US 6 (159th Street) – Markham, Oak ForestSigned as exits 348A (east) and 348B (west)
349.62562.66349 I-294 (Tri-State Tollway) – Wisconsin, IndianaSigned as exits 349A (north) and 349 (south) southbound; no northbound access to I-294 south; exits 7A-B on I-294
Posen350.15563.51350 IL 83 (147th Street / Sibley Boulevard)
Calumet Park353.25568.50353127th Street, Burr Oak Avenue
Calumet ParkChicago line354.25570.11354119th Street
Chicago355.27571.75355111th Street, Monterey Avenue
357.32575.05357
IL 1 south (Halsted Street)
Northern terminus of IL 1
358.47576.90
I-94 east (Bishop Ford Freeway) – Indiana
Northbound exit and southbound entrance; exit 63 on I-94
358.57577.06358Wentworth AvenueSouthbound exit only
359.12577.95
I-94 west (Dan Ryan Expressway) – Chicago Loop
Northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Charleston business loop

[edit]
Interstate 57 Business marker
Interstate 57 Business
LocationCharleston, Missouri
Length2.94 mi (4.73 km)

Interstate 57 Business (I-57 Bus.) in Charleston, Missouri, begins at I-57 exit 10. From this diamond interchange, it runs north concurrently with Route 105 along South Main Street into the city center. It then turns east onto Marshall Street, which also carries US 62 and Route 77. The business route ends at I-57 exit 12. US 62 and Route 77 continue to the east with US 60.[citation needed]

See also

[edit]

Notes

[edit]
  1. ^ Construction to widen I-57 to six lanes between Main Street and Vandenburg Boulevard in Jacksonville and the AR 5/AR 89 interchange is ongoing and is expected to be complete sometime in 2027.

References

[edit]
  1. ^ a b Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Archived from the original on July 3, 2017. Retrieved December 28, 2023.
  2. ^ American Association of State Highway and Transportation Officials. "Interstate Control Cities". American Association of State Highway and Transportation Officials. Archived from the original on June 24, 2021. Retrieved July 10, 2021.
  3. ^ Missouri Department of Transportation (n.d.). Exit 64A sign (Highway guide sign). Sikeston: Missouri Department of Transportation. Retrieved April 4, 2012.
  4. ^ "Arkansas to celebrate U.S. Highway 67's designation as Interstate 57 on Thursday". White River Now. Batesville, Arkansas. November 2, 2024. Retrieved November 7, 2024.
  5. ^ Illinois Division of Highways; H.M. Gousha (1959). Illinois Official Highway Map (Map). [1:790,00]. Springfield: Illinois Division of Highways – via Illinois Digital Archives.
  6. ^ "Kerner Dedicates Interstate 57 33-Mile Section". Herald and Review. Decatur, Illinois. September 27, 1961. p. 1. Retrieved November 13, 2024 – via Newspapers.com.
  7. ^ Michael, Terry (December 9, 1969). "Open I-57 Here Today..." Mt. Vernon Register-News. p. 8. Retrieved November 13, 2024 – via Newspapers.com.
  8. ^ "Dan Ryan Leg to Step Up Building Out Southwest". Chicago Tribune. March 25, 1967. p. 1A. Retrieved November 13, 2024 – via Newspapers.com.
  9. ^ Ogilvie, Richard B. (December 29, 1971). "Ogilvie Calls I-57 'lifeline linking people of state'". Southern Illinoisan. Carbondale, Illinois. p. 4. Retrieved November 13, 2024 – via Newspapers.com.
  10. ^ "Decision on I-57 Scheduled Today". Wisconsin State Journal. Madison, Wisconsin. March 9, 1972. p. 2. Retrieved November 13, 2024 – via Newspapers.com.
  11. ^ "Burlington Road to become 142". The Journal Times. Racine, Wisconsin. December 10, 1974. p. 6C. Retrieved November 13, 2024 – via Newspapers.com.
  12. ^ "I-57/I-70 Rehabilitation". Lochmueller Group. Archived from the original on March 24, 2016. Retrieved March 14, 2022.
  13. ^ "Interchange connecting I-57, I-294 opens". ABC7 Chicago. October 25, 2014. Archived from the original on March 14, 2022. Retrieved March 14, 2022.
  14. ^ "I-294/I-57 Interchange Project - Phase 2". Illinois State Toll Highway Authority. Archived from the original on November 4, 2022. Retrieved December 3, 2022.
  15. ^ Miller, Bob (February 27, 2023). "Extension of I-57 to impact national traffic, Poplar Bluff and Arkansas economies". Southeast Missourian. Archived from the original on May 18, 2023. Retrieved May 18, 2023.
  16. ^ "Statutory Listing of Corridor Descriptions". Federal Highway Administration. Archived from the original on January 10, 2018. Retrieved January 4, 2022.
  17. ^ "Arkansas Highway to Receive 'Future I-57' Designation". Times Record. Arkansas News Bureau. Archived from the original on June 2, 2017. Retrieved June 14, 2017.
  18. ^ "Highway 67 now designated as Interstate 57, will soon connect North Little Rock to Chicago". KARK. November 8, 2024. Retrieved November 13, 2024.
  19. ^ Heuring, Leonna (August 1, 2010). "MoDOT Celebrates Completion of US 60 Four-Lane Project with Caravan". The Southeast Missourian. Cape Girardeau, Missouri. Archived from the original on May 12, 2016. Retrieved April 26, 2016.
  20. ^ "U.S. 67 (Future I-57) in Butler County: Phase 3". Missouri Department of Transportation. Retrieved November 13, 2024.
  21. ^ Reaves, Jonathan (June 2017). "Arkansas 'has a lot of work to do' to bring 'Future I-57' to Missouri line". KASU-TV. Archived from the original on June 1, 2017. Retrieved June 14, 2017.
  22. ^ "I-57 route identified". Jonesboro Sun. October 25, 2023. Archived from the original on October 26, 2023. Retrieved October 26, 2023.
  23. ^ Arkansas Department of Transportation (October 25, 2023). "Future Interstate 57 Alignment from Walnut Ridge to Missouri State Line Chosen". Arkansas Department of Transportation. Retrieved November 13, 2024.
  24. ^ District 10. "Corning Bypass (Future I-57)" (PDF). Arkansas Department of Transportation. Retrieved November 25, 2024.
  25. ^ "ARDOT to Break Ground on Corning Bypass". Arkansas Department of Transportation. November 6, 2024. Retrieved November 25, 2024.
  26. ^ Missouri Department of Transportation (November 14, 2012). MoDOT HPMAPS (Map). Missouri Department of Transportation. Retrieved November 14, 2012.
  27. ^ "Map of Interstate 57 in Illinois" (Map). Google Maps. Retrieved July 10, 2014.
  28. ^ Dykstra, John (November 3, 2018). "I-57 interchange at Bourbonnais Parkway finally opens". The Daily Journal. Kankakee, Illinois. Archived from the original on November 3, 2018. Retrieved November 5, 2018.
[edit]
KML is from Wikidata